EV charging in Eufaula, Alabama
The federal register lists 12 charging locations in and around Eufaula, offering 28 ports between them. Of those, 8 sites have DC fast charging. That is the 9th highest count in Alabama.
Overview
Eufaula, AL has 12 charging locations on the federal register, offering 28 ports between them — the 9th largest count in Alabama.
DC fast ports make up 82.1% of capacity here — an unusually travel-oriented mix, typically the signature of interstate corridors rather than residential charging.
10 of the 12 locations are recorded as publicly accessible; the rest are restricted to residents, staff or fleet use.
The population here is 12,437 (2025 estimate).
Charging networks
| ChargePoint | 8 | 7 fast | 67% |
| Not part of a network | 2 | 17% | |
| Tesla | 1 | 16 fast | 8% |
| Loop | 1 | 8% |
Connector availability
how many sites list each connector| CCS (J1772 Combo) DC fast | 7 | 37% |
| Tesla / NACS AC or DC | 4 | 21% |
| J1772 AC | 4 | 21% |
| CHAdeMO DC fast | 4 | 21% |
Charging locations
| Site | Network | Ports | DC fast | Access |
|---|---|---|---|---|
| Eufaula, AL - Tesla Supercharger | Tesla | 16 | 16 | Public |
| City of Eufaula Scc 1 | ChargePoint | 2 | Public | |
| Community Charg Southeast Div-2 | ChargePoint | 1 | 1 | Public |
| Community Charg Southeast Div 1 | ChargePoint | 1 | 1 | Public |
| Georgia Power George Dc2 | ChargePoint | 1 | 1 | Public |
| Georgia Power George Dc1 | ChargePoint | 1 | 1 | Public |
| Optimus Cpo Eufaula Bk 3 | ChargePoint | 1 | 1 | Public |
| Optimus Cpo Eufaula Bk 2 | ChargePoint | 1 | 1 | Public |
| Optimus Cpo Eufaula Bk 4 | ChargePoint | 1 | 1 | Public |
| Alabama Power - Eufaula Garage | Not part of a network | 1 | Private | |
| Domino's Pizza | Loop | 1 | Public | |
| Alabama Power - Southeastern Division Office | Not part of a network | 1 | Private |
Also in this area
About this data
Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.