Skip to content
Pylon Plans

EV charging in Eureka Springs, Arkansas

The federal register lists 5 charging locations in and around Eureka Springs, offering 10 ports between them. None of them currently report DC fast charging, so plan for Level 2 speeds. That is the 15th highest count in Arkansas.

Charging locations
5
Total ports
10
DC fast share
0.0%
Ports per 10k residents
44.3
population 2,258 (2025)

Overview

The federal register lists 5 charging locations in and around Eureka Springs, AR, with 10 ports in total.

Only 0.0% of ports here are DC fast. Most of the capacity is Level 2, which suits workplaces, hotels and apartment parking rather than a quick stop mid-journey.

ChargePoint Network operates the most locations here, 2 of them — 40.0% of the local total.

The population here is 2,258 (2025 estimate).

Charging networks

Not part of a network 2
40%
ChargePoint 2
40%
Tesla Destination 1
20%

Connector availability

how many sites list each connector
J1772 AC 4
67%
Tesla / NACS AC or DC 2
33%

Charging locations

Site Network Ports DC fast Access
Arsenic and Old Lace Bed & Breakfast Inn - Tesla Destination Tesla Destination 2 Public
Lake Lucerne Resort and Ranch Not part of a network 2 Public
Basin Park Basin Hotel 2 ChargePoint 2 Public
Basin Park Basin Hotel 1 ChargePoint 2 Public
Planer Hill Park & Ride Not part of a network 2 Public

Also in this area

About this data

Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.