EV charging in Fort Walton Beach, Florida
The federal register lists 12 charging locations in and around Fort Walton Beach, offering 26 ports between them. Of those, 5 sites have DC fast charging. That is the 87th highest count in Florida.
Overview
The federal register lists 12 charging locations in and around Fort Walton Beach, FL, with 26 ports in total.
5 of the 12 locations have at least one DC fast port, or 41.7% of sites.
10 of the 12 locations are recorded as publicly accessible; the rest are restricted to residents, staff or fleet use.
The population here is 21,097 (2025 estimate).
Charging networks
| Blink | 4 | 4 fast | 33% |
| Not part of a network | 3 | 1 fast | 25% |
| Fplev | 2 | 6 fast | 17% |
| Tesla Destination | 1 | 8% | |
| EV Connect | 1 | 8% | |
| ChargePoint | 1 | 8% |
Connector availability
how many sites list each connector| J1772 AC | 6 | 43% |
| CCS (J1772 Combo) DC fast | 5 | 36% |
| Tesla / NACS AC or DC | 2 | 14% |
| CHAdeMO DC fast | 1 | 7% |
Charging locations
| Site | Network | Ports | DC fast | Access |
|---|---|---|---|---|
| FPL EVolution - Holiday Inn Express | Fplev | 4 | 4 | Public |
| Fort Walton Beach Medical Center - Employee Parking | Blink | 4 | Public | |
| Fort Walton Beach Medical Center - Visitor Parking | Blink | 4 | Public | |
| Wright Plaza | Fplev | 2 | 2 | Public |
| Step One GMC Cadillac Ft Walton Beach | Blink | 2 | 2 | Public |
| Step One GMC Cadillac Ft Walton Beach - Series | Blink | 2 | 2 | Public |
| Fairfield by Marriott Inn & Suites Fort Walton Beach Hurlburt Area - Tesla Destination | Tesla Destination | 2 | Public | |
| Mbzfwb Station 1 | ChargePoint | 2 | Public | |
| Step One Volkswagen Fort Walton Beach | Not part of a network | 1 | 1 | Private |
| Lee Nissan | Not part of a network | 1 | Public | |
| Lee Nissan | Not part of a network | 1 | Private | |
| Cadillac Fort Walton Beach | EV Connect | 1 | Public |
Also in this area
About this data
Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.