Jacksonville, FL - Phillips Highway - Tesla Supercharger
Jacksonville, Florida DC fast
Overview
Jacksonville, FL - Phillips Highway - Tesla Supercharger is charging at a fuel station in Jacksonville, FL, providing 12 DC fast ports.
Jacksonville, FL has 216 DC fast ports across 38 locations, and this site accounts for 12 of them.
Connectors on site: Tesla / NACS. Tesla’s connector, standardised as NACS (SAE J3400). The same plug carries both AC and DC, so a NACS socket alone does not tell you the speed — Superchargers are DC, Destination chargers are AC. Most North American manufacturers have committed to adopting the standard.
Tesla operates 234 sites across Florida, so the same app or card should work at the others.
The nearest other charging location is 2.5 km to the SE, and there are 85 others within 10 km.
The register classifies the host location as a fuel station, which is a reasonable guide to how long you can reasonably stay.
Charging equipment
| Type | Ports | Typical power |
|---|---|---|
| DC fast | 12 | Typically 50–350 kW |
Connectors
- Tesla / NACS DC fast
- Tesla’s connector, standardised as NACS (SAE J3400). The same plug carries both AC and DC, so a NACS socket alone does not tell you the speed — Superchargers are DC, Destination chargers are AC. Most North American manufacturers have committed to adopting the standard.
Location
Loading the map fetches tiles from OpenFreeMap, a third party. Nothing is requested from them until you press the button.
© OpenStreetMap contributors · tiles by OpenFreeMap
Station record
as reported to the AFDC| Address | 5735 Philips Highway |
|---|---|
| City | Jacksonville, FL 32216 |
| Network | Tesla |
| Access | Public |
| Hours | 24 hours daily. NACS partner enabled. |
| Opened | 21 Jul 2021 |
| Coordinates | 30.26580, -81.61666 |
| AFDC station ID | 194076 |
| Last confirmed by AFDC | 18 Jun 2026 |
Nearest charging locations
| Distance | Bearing | Site | DC fast |
|---|---|---|---|
| 2.5 km (1.6 mi) | SE | Fairfield Inn & Suites Jacksonville Butler Boulevard - Tesla Destination | |
| 2.6 km (1.6 mi) | SE | Hampton Inn Jacksonville South/I-95 at JTB - Tesla Destination | |
| 2.6 km (1.6 mi) | ESE | Miller Electric | |
| 2.6 km (1.6 mi) | ESE | Miller Electric HQ - Atom Power EV-Charging | |
| 2.7 km (1.7 mi) | ESE | Miller Electric Company | 2 |
About this record
Taken from the AFDC register, which covers publicly reported charging infrastructure across the United States. Home chargers and unreported private installations do not appear in it.
Port counts describe how the site is configured, not whether a given port is free right now. Check the operator's own app before setting out if you are relying on a specific charger.