The federal register lists 14 charging locations in and around Jupiter, offering 56 ports between them. Of those, 4 sites have DC fast charging. That is the 72nd highest count in Florida.

Charging locations
14
Total ports
56
DC fast share
28.6%
16 fast ports
Ports per 10k residents
9.0
population 62,350 (2025)

Overview

Of the 14 charging locations on file in Jupiter, FL, 4 offer DC fast charging.

16 of those ports are DC fast — 28.6% of the total. That share is what decides whether a place works for a road trip or only for charging while parked overnight.

Non-Networked operates the most locations here, 4 of them — 28.6% of the local total.

The population here is 62,350 (2025 estimate).

Charging networks

Not part of a network 4
29%
Fplev 3 12 fast
21%
ChargePoint 3
21%
Noodoe 1
7%
Evgateway 1
7%
Circle K 1 4 fast
7%
Blink 1
7%

Connector availability

how many sites list each connector
J1772 AC 10
59%
CCS (J1772 Combo) DC fast 4
24%
CHAdeMO DC fast 2
12%
Tesla / NACS AC or DC 1
6%

Charging locations

Site Network Ports DC fast Access
Florida Power & Light - Jupiter West Office Not part of a network 12 Private
Jupiter Medical Evgateway 8 Public
CircleK - Jupiter, FL Circle K 4 4 Public
Simms Creek Plaza Fplev 4 4 Public
Jupiter Farms Shopping Center Fplev 4 4 Public
Shell - 4 Points Market Fplev 4 4 Public
Florida Power & Light - Jupiter Service Center Not part of a network 4 Private
Jupiter Beach Resort Blink 4 Public
Jupiter Town Hall Complex Not part of a network 2 Public
Carmine's Coal Fired Pizza Not part of a network 2 Public
Fpl Evolution Jupiter Med 1 ChargePoint 2 Public
Fpl Evolution Jupiter Med 2 ChargePoint 2 Public
Fpl Evolution Jupiter Med 3 ChargePoint 2 Public
Bermudiana 1 Noodoe 2 Public

Also in this area

About this data

Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.