EV charging in East Point, Georgia
The federal register lists 12 charging locations in and around East Point, offering 93 ports between them. Of those, 3 sites have DC fast charging. That is the 46th highest count in Georgia.
Overview
12 charging locations are on file in East Point, GA, run between 5 networks.
3 of the 12 locations have at least one DC fast port, or 25.0% of sites.
5 different charging networks operate in East Point, GA, which in practice means carrying more than one app or card.
Per head the figure is 24.30 ports per 10,000 people, though charging tends to follow traffic and retail rather than residents.
Charging networks
| ChargePoint | 7 | 58% | |
| Tesla | 2 | 28 fast | 17% |
| Tesla Destination | 1 | 8% | |
| Flash | 1 | 8% | |
| Electrify America | 1 | 8 fast | 8% |
Connector availability
how many sites list each connector| J1772 AC | 8 | 62% |
| Tesla / NACS AC or DC | 3 | 23% |
| CCS (J1772 Combo) DC fast | 2 | 15% |
Charging locations
| Site | Network | Ports | DC fast | Access |
|---|---|---|---|---|
| Peachy Airport Indoor | Flash | 31 | Public | |
| East Point, GA - North Commerce Dr - Tesla Supercharger | Tesla | 16 | 16 | Public |
| East Point, GA - Tesla Supercharger | Tesla | 12 | 12 | Public |
| Elite Airport Parking - Tesla Destination | Tesla Destination | 12 | Public | |
| Walmart 6998 (East Point, GA) | Electrify America | 8 | 8 | Public |
| City Hall-ep Customer Care 1 | ChargePoint | 2 | Public | |
| City Hall-ep Customer Care 2 | ChargePoint | 2 | Public | |
| City Hall-ep Jeff Park Rec | ChargePoint | 2 | Public | |
| City Hall-ep Summer Park | ChargePoint | 2 | Public | |
| City Hall-ep John D Milner | ChargePoint | 2 | Public | |
| City Hall-ep Sykes Park | ChargePoint | 2 | Public | |
| City Hall-ep Brookdale Park | ChargePoint | 2 | Public |
Also in this area
About this data
Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.