EV charging in Decatur, Illinois
The federal register lists 13 charging locations in and around Decatur, offering 25 ports between them. Of those, 6 sites have DC fast charging. That is the 29th highest count in Illinois.
Overview
13 charging locations are on file in Decatur, IL, run between 5 networks.
The register counts 25 ports here, 12 of them DC fast.
ChargePoint Network operates the most locations here, 8 of them — 61.5% of the local total.
Against a population of 67,884, that is 3.70 ports per 10,000 residents.
Charging networks
| ChargePoint | 8 | 4 fast | 62% |
| Not part of a network | 2 | 15% | |
| EVgo | 1 | 4 fast | 8% |
| Universal | 1 | 4 fast | 8% |
| Tesla Destination | 1 | 8% |
Connector availability
how many sites list each connector| CCS (J1772 Combo) DC fast | 6 | 35% |
| J1772 AC | 6 | 35% |
| CHAdeMO DC fast | 4 | 24% |
| Tesla / NACS AC or DC | 1 | 6% |
Charging locations
| Site | Network | Ports | DC fast | Access |
|---|---|---|---|---|
| Sleep Inn | Universal | 4 | 4 | Public |
| Pilot Travel Center 368 | EVgo | 4 | 4 | Public |
| Hampton Inn Decatur Mt. Zion - Tesla Destination | Tesla Destination | 3 | Public | |
| City of Decatur Fairview #1 | ChargePoint | 2 | Public | |
| City of Decatur Fairview #2 | ChargePoint | 2 | Public | |
| City of Decatur Fairview #4 | ChargePoint | 2 | Public | |
| City of Decatur Fairview #5 | ChargePoint | 2 | Public | |
| City of Decatur Civic Center 2 | ChargePoint | 1 | 1 | Public |
| City of Decatur Library | ChargePoint | 1 | 1 | Public |
| City of Decatur Nelson Park 02 | ChargePoint | 1 | 1 | Public |
| City of Decatur Nelson Park 01 | ChargePoint | 1 | 1 | Public |
| Crown Nissan - Decatur | Not part of a network | 1 | Public | |
| Crown Nissan - Decatur | Not part of a network | 1 | Private |
Also in this area
About this data
Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.