Skip to content
Pylon Plans

EV charging in Berea, Kentucky

The federal register lists 6 charging locations in and around Berea, offering 20 ports between them. Of those, 1 sites have DC fast charging. That is the 11th highest count in Kentucky.

Charging locations
6
Total ports
20
DC fast share
20.0%
4 fast ports
Ports per 10k residents
12.0
population 16,662 (2025)

Overview

6 charging locations are on file in Berea, KY, run between 2 networks.

4 of those ports are DC fast — 20.0% of the total. That share is what decides whether a place works for a road trip or only for charging while parked overnight.

Only 2 networks operate here, so coverage depends heavily on membership.

The population here is 16,662 (2025 estimate).

Charging networks

Not part of a network 5
83%
Circle K 1 4 fast
17%

Connector availability

how many sites list each connector
J1772 AC 5
71%
Tesla / NACS AC or DC 1
14%
CCS (J1772 Combo) DC fast 1
14%

Charging locations

Site Network Ports DC fast Access
Berea City Hall Not part of a network 8 Public
CircleK - Berea, KY Circle K 4 4 Public
Berea Municipal Utilities Not part of a network 4 Public
Berea College Forestry Center Not part of a network 2 Public
Historic Boone Tavern Hotel and Restaurant Not part of a network 1 Public
Boone Hotel & Restaurant Not part of a network 1 Public

Also in this area

About this data

Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.