EV charging in Linthicum, Maryland
The federal register lists 15 charging locations in and around Linthicum, offering 55 ports between them. Of those, 1 sites have DC fast charging. That is the 31st highest count in Maryland.
Charging locations
15
Total ports
55
DC fast share
21.8%
12 fast ports
Overview
The federal register lists 15 charging locations in and around Linthicum, MD, with 55 ports in total.
The register counts 55 ports here, 12 of them DC fast.
ChargePoint Network operates the most locations here, 6 of them — 40.0% of the local total.
Charging networks
| ChargePoint | 6 | 40% | |
| Tesla Destination | 4 | 27% | |
| Loop | 2 | 13% | |
| Blink | 2 | 13% | |
| SWTCH | 1 | 12 fast | 7% |
Connector availability
how many sites list each connector| J1772 AC | 14 | 70% |
| Tesla / NACS AC or DC | 4 | 20% |
| CCS (J1772 Combo) DC fast | 1 | 5% |
| CHAdeMO DC fast | 1 | 5% |
Charging locations
| Site | Network | Ports | DC fast | Access |
|---|---|---|---|---|
| EVsmart - BGE - BWI Rideshare Lot | SWTCH | 12 | 12 | Public |
| Tathata | Blink | 6 | Public | |
| Fairfield Inn & Suites BWI Airport Hotel - Tesla Destination | Tesla Destination | 6 | Public | |
| 20550 | Blink | 4 | Public | |
| La Quinta Inn & Suites by Wyndham Baltimore BWI Airport - Tesla Destination | Tesla Destination | 4 | Public | |
| Sheraton Baltimore Washington Airport Hotel - BWI - Tesla Destination | Tesla Destination | 4 | Public | |
| Residence Inn BWI - Tesla Destination | Tesla Destination | 3 | Public | |
| Mta Ltr N Linthicum | ChargePoint | 2 | Public | |
| Mta Marc Bwi56 | ChargePoint | 2 | Public | |
| Mta Marc Bwi12 | ChargePoint | 2 | Public | |
| Fello 999 Corporate | ChargePoint | 2 | Public | |
| Fello 999 Corporate 2 | ChargePoint | 2 | Public | |
| Avalon at Arundel Crossing I | Loop | 2 | Public | |
| Avalon at Arundel Crossing II | Loop | 2 | Public | |
| Hhc Columbia Mob-station 25 | ChargePoint | 2 | Public |
Also in this area
About this data
Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.