Skip to content
Pylon Plans

EV charging in Nantucket, Massachusetts

The federal register lists 19 charging locations in and around Nantucket, offering 38 ports between them. None of them currently report DC fast charging, so plan for Level 2 speeds. That is the 64th highest count in Massachusetts.

Charging locations
19
Total ports
38
DC fast share
0.0%

Overview

19 charging locations are on file in Nantucket, MA, run between 3 networks.

Only 0.0% of ports here are DC fast. Most of the capacity is Level 2, which suits workplaces, hotels and apartment parking rather than a quick stop mid-journey.

ChargePoint Network operates the most locations here, 15 of them — 78.9% of the local total.

Charging networks

ChargePoint 15
79%
Tesla Destination 2
11%
Not part of a network 2
11%

Connector availability

how many sites list each connector
J1772 AC 17
89%
Tesla / NACS AC or DC 2
11%

Charging locations

Site Network Ports DC fast Access
Nantucket Airport Not part of a network 3 Public
Town of Nantucket - Town Hall Annex ChargePoint 2 Public
The Westmoor Club - Tesla Destination Tesla Destination 2 Public
Great Harbor Yacht Club - Tesla Destination Tesla Destination 2 Public
Townofnantucket Station#2 ChargePoint 2 Public
Townofnantucket Fairgrounds2 ChargePoint 2 Public
Townofnantucket Airport1 ChargePoint 2 Public
Townofnantucket Station #1 ChargePoint 2 Public
Townofnantucket Fairgrounds1 ChargePoint 2 Public
Townofnantucket Pleasant St #1 ChargePoint 2 Public
Partners Health Nch #1 ChargePoint 2 Public
Partners Health Nch #2 ChargePoint 2 Public
Townofnantucket Nobadeer Fld #2 ChargePoint 2 Public
Townofnantucket Nobadeer Fld 1 ChargePoint 2 Public
Townofnantucket Surfside Left ChargePoint 2 Public
Townofnantucket Jetties Right ChargePoint 2 Public
Townofnantucket Jetties Left ChargePoint 2 Public
Townofnantucket Surfside Right ChargePoint 2 Public
State Police Nantucket Barracks Not part of a network 1 Private

Also in this area

About this data

Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.