Skip to content
Pylon Plans

EV charging in Bay City, Michigan

The federal register lists 14 charging locations in and around Bay City, offering 39 ports between them. Of those, 4 sites have DC fast charging. That is the 32nd highest count in Michigan.

Charging locations
14
Total ports
39
DC fast share
46.2%
18 fast ports
Ports per 10k residents
12.2
population 31,868 (2025)

Overview

14 charging locations are on file in Bay City, MI, run between 6 networks.

The register counts 39 ports here, 18 of them DC fast.

Non-Networked operates the most locations here, 7 of them — 50.0% of the local total.

Against a population of 31,868, that is 12.20 ports per 10,000 residents.

Charging networks

Not part of a network 7
50%
ChargePoint 2
14%
Blink 2 4 fast
14%
Tesla 1 8 fast
7%
RED E 1 2 fast
7%
Electrify America 1 4 fast
7%

Connector availability

how many sites list each connector
J1772 AC 9
56%
CCS (J1772 Combo) DC fast 3
19%
NEMA 14-50 AC 2
13%
Tesla / NACS AC or DC 1
6%
CHAdeMO DC fast 1
6%

Charging locations

Site Network Ports DC fast Access
Bay City, MI - Tesla Supercharger Tesla 8 8 Public
Meijer Bay City (Bay City, MI) Electrify America 4 4 Public
Garber Ford Bay City - DCFC Blink 4 4 Public
Graff Chevrolet Bay City MI RED E 4 2 Public
Garber Ford Bay City - Series Blink 4 Public
Showcase Mitsubishi Not part of a network 3 Public
Thelen Chrysler Jeep Dodge Ram Not part of a network 2 Private
Thelen Audi Volkswagen Mazda Not part of a network 2 Public
Michigan Depart Station 1 ChargePoint 2 Public
Michigan Depart Station 2 ChargePoint 2 Public
Bay City - State Recreation Area Not part of a network 1 Public
Graff Chevrolet Not part of a network 1 Public
Bay City - Water St Parking Lot Not part of a network 1 Public
Bay City - Delta College Planetarium Not part of a network 1 Public

Also in this area

About this data

Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.