EV charging in Grayling, Michigan
The federal register lists 9 charging locations in and around Grayling, offering 18 ports between them. Of those, 2 sites have DC fast charging. That is the 50th highest count in Michigan.
Overview
Of the 9 charging locations on file in Grayling, MI, 2 offer DC fast charging.
2 of the 9 locations have at least one DC fast port, or 22.2% of sites.
8 of the 9 locations are recorded as publicly accessible; the rest are restricted to residents, staff or fleet use.
Per head the figure is 91.40 ports per 10,000 people, though charging tends to follow traffic and retail rather than residents.
Charging networks
| RED E | 4 | 2 fast | 44% |
| Not part of a network | 2 | 22% | |
| Rivian Waypoints | 1 | 11% | |
| Rivian Adventure Network | 1 | 6 fast | 11% |
| ChargePoint | 1 | 11% |
Connector availability
how many sites list each connector| J1772 AC | 7 | 78% |
| Tesla / NACS AC or DC | 1 | 11% |
| CCS (J1772 Combo) DC fast | 1 | 11% |
Charging locations
| Site | Network | Ports | DC fast | Access |
|---|---|---|---|---|
| Grayling, MI | Rivian Adventure Network | 6 | 6 | Public |
| Grayling Public Parking | RED E | 2 | 2 | Public |
| Campground Ev1$ Campground | ChargePoint | 2 | Public | |
| Kirtland Community College | RED E | 2 | Public | |
| Hartwick Pines State Park | Rivian Waypoints | 2 | Public | |
| Feeny Ford of Grayling | Not part of a network | 1 | Private | |
| Dairy Queen | Not part of a network | 1 | Public | |
| Kirtland Community College Shipping and Receiving | RED E | 1 | Public | |
| Kirtland Community College Fleet Parking | RED E | 1 | Public |
Also in this area
About this data
Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.