EV charging in Mackinaw City, Michigan
The federal register lists 9 charging locations in and around Mackinaw City, offering 35 ports between them. Of those, 4 sites have DC fast charging. That is the 50th highest count in Michigan.
Overview
9 charging locations are on file in Mackinaw City, MI, run between 6 networks.
DC fast ports make up 54.3% of capacity here — an unusually travel-oriented mix, typically the signature of interstate corridors rather than residential charging.
6 different charging networks operate in Mackinaw City, MI, which in practice means carrying more than one app or card.
Charging networks
| ChargePoint | 3 | 1 fast | 33% |
| RED E | 2 | 4 fast | 22% |
| Tesla Destination | 1 | 11% | |
| Tesla | 1 | 8 fast | 11% |
| Rivian Adventure Network | 1 | 6 fast | 11% |
| Not part of a network | 1 | 11% |
Connector availability
how many sites list each connector| CCS (J1772 Combo) DC fast | 4 | 36% |
| J1772 AC | 4 | 36% |
| Tesla / NACS AC or DC | 2 | 18% |
| CHAdeMO DC fast | 1 | 9% |
Charging locations
| Site | Network | Ports | DC fast | Access |
|---|---|---|---|---|
| Mackinaw City, MI - Tesla Supercharger | Tesla | 8 | 8 | Public |
| Mackinaw City, MI | Rivian Adventure Network | 6 | 6 | Public |
| FasCharge 5017 Next Door Marathon Mackinaw City | RED E | 4 | 4 | Public |
| Mackinaw City Marina - Tesla Destination | Tesla Destination | 4 | Public | |
| Mackinaw City KOA | Not part of a network | 4 | Public | |
| Mackinaw KOA Camp | RED E | 4 | Public | |
| Day Parking Lot Station #2 | ChargePoint | 2 | Public | |
| Day Parking Lot Station #1 | ChargePoint | 2 | Public | |
| Hion Network Mackinaw Dc4 | ChargePoint | 1 | 1 | Public |
About this data
Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.