The federal register lists 13 charging locations in and around New Brighton, offering 60 ports between them. Of those, 10 sites have DC fast charging. That is the 16th highest count in Minnesota.

Charging locations
13
Total ports
60
DC fast share
41.7%
25 fast ports
Ports per 10k residents
27.1
population 22,159 (2025)

Overview

Of the 13 charging locations on file in New Brighton, MN, 10 offer DC fast charging.

25 of those ports are DC fast — 41.7% of the total. That share is what decides whether a place works for a road trip or only for charging while parked overnight.

DIRT_ROAD operates the most locations here, 9 of them — 69.2% of the local total.

The population here is 22,159 (2025 estimate).

Charging networks

Dirt Road 9 19 fast
69%
Blink 2 6 fast
15%
Tesla Destination 1
8%
Not part of a network 1
8%

Connector availability

how many sites list each connector
J1772 AC 11
50%
CCS (J1772 Combo) DC fast 10
45%
Tesla / NACS AC or DC 1
5%

Charging locations

Site Network Ports DC fast Access
New Brighton Ford Blink 12 Public
New Brighton Ford - DCFC Blink 6 6 Public
Freedom Park Dirt Road 5 3 Public
Driftwood Park Dirt Road 5 3 Public
Sunny Square Park Dirt Road 4 2 Public
Hansen Park (West Lot) Dirt Road 4 2 Public
Innsbruck Park Dirt Road 4 2 Public
Brightwood Hills Golf Course Dirt Road 4 2 Public
City Hall Dirt Road 4 2 Public
Public Safety Dirt Road 4 2 Public
Homewood Suites by Hilton Minneapolis-New Brighton - Tesla Destination Tesla Destination 4 Public
Community Center Dirt Road 3 1 Public
New Brighton Ford Not part of a network 1 Private

About this data

Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.