EV charging in Starkville, Mississippi
The federal register lists 11 charging locations in and around Starkville, offering 24 ports between them. Of those, 2 sites have DC fast charging. That is the 5th highest count in Mississippi.
Overview
The federal register lists 11 charging locations in and around Starkville, MS, with 24 ports in total.
2 of those ports are DC fast — 8.3% of the total. That share is what decides whether a place works for a road trip or only for charging while parked overnight.
ChargePoint Network operates the most locations here, 6 of them — 54.5% of the local total.
Per head the figure is 9.30 ports per 10,000 people, though charging tends to follow traffic and retail rather than residents.
Charging networks
| ChargePoint | 6 | 2 fast | 55% |
| Tesla Destination | 2 | 18% | |
| Not part of a network | 1 | 9% | |
| Envirospark | 1 | 9% | |
| Ampup | 1 | 9% |
Connector availability
how many sites list each connector| J1772 AC | 7 | 54% |
| Tesla / NACS AC or DC | 3 | 23% |
| CCS (J1772 Combo) DC fast | 2 | 15% |
| CHAdeMO DC fast | 1 | 8% |
Charging locations
| Site | Network | Ports | DC fast | Access |
|---|---|---|---|---|
| Comfort Suites Starkville - Tesla Destination | Tesla Destination | 4 | Public | |
| Hampton Inn - Starkville | Envirospark | 4 | Public | |
| Hampton Inn Starkville - Tesla Destination | Tesla Destination | 3 | Public | |
| Starkville Util Starkville Rec | ChargePoint | 2 | Public | |
| Starkville Util Starkville Dwtn | ChargePoint | 2 | Public | |
| The Vista Tvs #1 | ChargePoint | 2 | Public | |
| The Vista Tvs #2 | ChargePoint | 2 | Public | |
| Domino's #5962 | Ampup | 2 | Private | |
| Starkville Util Station 1 (l) | ChargePoint | 1 | 1 | Public |
| Starkville Util Station 2 (r) | ChargePoint | 1 | 1 | Public |
| Mississippi State University - Center for Advanced Vehicular Systems | Not part of a network | 1 | Public |
Also in this area
About this data
Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.