EV charging in Kirksville, Missouri
The federal register lists 5 charging locations in and around Kirksville, offering 10 ports between them. Of those, 3 sites have DC fast charging. That is the 42nd highest count in Missouri.
Overview
The federal register lists 5 charging locations in and around Kirksville, MO, with 10 ports in total.
3 of the 5 locations have at least one DC fast port, or 60.0% of sites.
ChargePoint Network operates the most locations here, 3 of them — 60.0% of the local total.
Per head the figure is 5.60 ports per 10,000 people, though charging tends to follow traffic and retail rather than residents.
Charging networks
| ChargePoint | 3 | 2 fast | 60% |
| Not part of a network | 1 | 20% | |
| Noodoe | 1 | 2 fast | 20% |
Connector availability
how many sites list each connector| CCS (J1772 Combo) DC fast | 3 | 38% |
| J1772 AC | 2 | 25% |
| CHAdeMO DC fast | 2 | 25% |
| Tesla / NACS AC or DC | 1 | 13% |
Charging locations
| Site | Network | Ports | DC fast | Access |
|---|---|---|---|---|
| Gutensohn Osteopathic Health and Wellness Clinic | Not part of a network | 4 | Public | |
| EVre - Ayerco 29 - Kirksville | Noodoe | 2 | 2 | Public |
| Ayerco Ayerco29kirkl2 | ChargePoint | 2 | Public | |
| Ayerco Ayerco29kirkdc1 | ChargePoint | 1 | 1 | Public |
| Ayerco Ayerco29kirkdc2 | ChargePoint | 1 | 1 | Public |
Also in this area
About this data
Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.