Raytheon Technologies - Pratt & Whitney Division
Asheville, North Carolina
Overview
Open since 2023, Raytheon Technologies - Pratt & Whitney Division in Asheville, NC provides 24 Level 2 ports.
By number of ports it is the 1st largest of 65 charging locations in Asheville, NC.
Connectors on site: J1772. The standard AC connector on North American EVs other than Tesla. Every non-Tesla EV sold in the US can use it directly, and Teslas can with the adapter that ships with the car.
Access is listed as public, available 24 hours daily.
This is a well-served area: 47 other charging locations sit within 10 km.
Of the 65 charging locations in Asheville, NC, 12 offer DC fast charging.
Charging equipment
| Type | Ports | Typical power |
|---|---|---|
| Level 2 | 24 | Typically 6–19 kW |
Connectors
- J1772 AC
- The standard AC connector on North American EVs other than Tesla. Every non-Tesla EV sold in the US can use it directly, and Teslas can with the adapter that ships with the car.
Location
Loading the map fetches tiles from OpenFreeMap, a third party. Nothing is requested from them until you press the button.
© OpenStreetMap contributors · tiles by OpenFreeMap
Station record
as reported to the AFDC| Address | 330 Pratt And Whitney Boulevard |
|---|---|
| City | Asheville, NC 28803 |
| Network | Blink |
| Access | Public |
| Hours | 24 hours daily |
| Opened | 5 Sept 2023 |
| Coordinates | 35.50630, -82.58420 |
| AFDC station ID | 358445 |
| Last confirmed by AFDC | 28 Aug 2026 |
Nearest charging locations
| Distance | Bearing | Site | DC fast |
|---|---|---|---|
| 2.6 km (1.6 mi) | S | Scb Arden Pines | |
| 3.2 km (2.0 mi) | NW | Asheville, NC | 6 |
| 3.3 km (2.1 mi) | NW | Ingles Market | |
| 3.3 km (2.1 mi) | SSE | Sunshine Chevrolet | |
| 3.3 km (2.1 mi) | NW | Asheville, NC - Tesla Supercharger | 12 |
About this record
This entry comes from the Alternative Fuels Data Center's public station register, last confirmed by them on 2026-08-28. Port counts and connector types are as reported by the site operator.
Port counts describe how the site is configured, not whether a given port is free right now. Check the operator's own app before setting out if you are relying on a specific charger.