EV charging in Findlay, Ohio
The federal register lists 12 charging locations in and around Findlay, offering 45 ports between them. Of those, 5 sites have DC fast charging. That is the 23rd highest count in Ohio.
Overview
The federal register lists 12 charging locations in and around Findlay, OH, with 45 ports in total.
30 of those ports are DC fast — 66.7% of the total. That share is what decides whether a place works for a road trip or only for charging while parked overnight.
EV Connect operates the most locations here, 4 of them — 33.3% of the local total.
Per head the figure is 11.10 ports per 10,000 people, though charging tends to follow traffic and retail rather than residents.
Charging networks
| EV Connect | 4 | 2 fast | 33% |
| Tesla | 2 | 20 fast | 17% |
| Not part of a network | 2 | 17% | |
| ChargePoint | 2 | 17% | |
| EVgo | 1 | 4 fast | 8% |
| Ford Charge | 1 | 4 fast | 8% |
Connector availability
how many sites list each connector| J1772 AC | 8 | 57% |
| Tesla / NACS AC or DC | 3 | 21% |
| CCS (J1772 Combo) DC fast | 3 | 21% |
Charging locations
| Site | Network | Ports | DC fast | Access |
|---|---|---|---|---|
| Findlay, OH - West Main Cross Street - Tesla Supercharger | Tesla | 12 | 12 | Public |
| Findlay, OH - Tesla Supercharger | Tesla | 8 | 8 | Public |
| Reineke Ford of Findlay | Ford Charge | 4 | 4 | Public |
| Pilot Travel Center 360 | EVgo | 4 | 4 | Public |
| 2406 | EV Connect | 4 | Public | |
| Lariche Cadillac | EV Connect | 3 | 2 | Public |
| 2407 | EV Connect | 2 | Public | |
| Aaa Mid States Aaa Mid States | ChargePoint | 2 | Public | |
| Spectrumfindlay Findlayspectrum | ChargePoint | 2 | Public | |
| City Express Findlay OH | EV Connect | 2 | Public | |
| Reineke Ford Lincoln | Not part of a network | 1 | Public | |
| EVPassport - FriendsOffice | Not part of a network | 1 | Public |
Also in this area
About this data
Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.