EV charging in Youngstown, Ohio
The federal register lists 12 charging locations in and around Youngstown, offering 31 ports between them. Of those, 2 sites have DC fast charging. That is the 23rd highest count in Ohio.
Overview
12 charging locations are on file in Youngstown, OH, run between 4 networks.
6 of those ports are DC fast — 19.4% of the total. That share is what decides whether a place works for a road trip or only for charging while parked overnight.
ChargePoint Network operates the most locations here, 6 of them — 50.0% of the local total.
Against a population of 58,832, that is 5.30 ports per 10,000 residents.
Charging networks
| ChargePoint | 6 | 2 fast | 50% |
| Not part of a network | 4 | 33% | |
| Ford Charge | 1 | 4 fast | 8% |
| Blink | 1 | 8% |
Connector availability
how many sites list each connector| J1772 AC | 10 | 77% |
| CCS (J1772 Combo) DC fast | 2 | 15% |
| Tesla / NACS AC or DC | 1 | 8% |
Charging locations
| Site | Network | Ports | DC fast | Access |
|---|---|---|---|---|
| Hollywood Gaming at Mahoning Valley Race Course | Not part of a network | 6 | Public | |
| #1 Cochran Ford Austintown | Ford Charge | 4 | 4 | Public |
| Akron Children’s Hospital | Not part of a network | 4 | Public | |
| Cochranauto Boardmanfordl | ChargePoint | 2 | 2 | Public |
| Station 1 - Doctor's Parking | Blink | 2 | Public | |
| 604 Mahoning Station 3 | ChargePoint | 2 | Public | |
| 604 Mahoning Station 2 | ChargePoint | 2 | Public | |
| 604 Mahoning Station 1 | ChargePoint | 2 | Public | |
| The Public Library of Youngstown & Mahoning County | Not part of a network | 2 | Public | |
| Mitsubishi 7c Mitsubishi Main | ChargePoint | 2 | Public | |
| Cochranauto Boardmanford L2 | ChargePoint | 2 | Public | |
| Donnell Ford | Not part of a network | 1 | Public |
Also in this area
About this data
Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.