Allentown, PA - South Cedar Crest Boulevard - Tesla Supercharger
Allentown, Pennsylvania DC fast
Overview
Open since 2025, Allentown, PA - South Cedar Crest Boulevard - Tesla Supercharger in Allentown, PA provides 8 DC fast ports.
By number of ports it is the 3rd largest of 53 charging locations in Allentown, PA.
A Tesla/NACS connector is listed here. Tesla’s connector, standardised as NACS (SAE J3400). The same plug carries both AC and DC, so a NACS socket alone does not tell you the speed — Superchargers are DC, Destination chargers are AC. Most North American manufacturers have committed to adopting the standard.
It is a public site at a fuel station, so opening hours in practice may follow the host business rather than the charging network.
This is a well-served area: 55 other charging locations sit within 10 km.
Allentown, PA has 53 charging locations on the register between them offering 152 ports.
Charging equipment
| Type | Ports | Typical power |
|---|---|---|
| DC fast | 8 | Typically 50–350 kW |
Connectors
- Tesla / NACS DC fast
- Tesla’s connector, standardised as NACS (SAE J3400). The same plug carries both AC and DC, so a NACS socket alone does not tell you the speed — Superchargers are DC, Destination chargers are AC. Most North American manufacturers have committed to adopting the standard.
Location
Loading the map fetches tiles from OpenFreeMap, a third party. Nothing is requested from them until you press the button.
© OpenStreetMap contributors · tiles by OpenFreeMap
Station record
as reported to the AFDC| Address | 408 S Cedar Crest Blvd |
|---|---|
| City | Allentown, PA 18103 |
| Network | Tesla |
| Access | Public |
| Hours | 24 hours daily. NACS partner enabled. |
| Opened | 19 Mar 2025 |
| Coordinates | 40.58224, -75.52273 |
| AFDC station ID | 390496 |
| Last confirmed by AFDC | 18 Jun 2026 |
Nearest charging locations
| Distance | Bearing | Site | DC fast |
|---|---|---|---|
| 567 m | N | Cedar Crest College | |
| 1.7 km (1.1 mi) | N | Brixmor Village West (Allentown, PA) | 4 |
| 1.8 km (1.1 mi) | NNE | Fahy Commons | |
| 2.0 km (1.2 mi) | NE | SWTCH Energy Inc. | |
| 2.0 km (1.3 mi) | S | Cedar Crest Hospital - Phase 2 |
About this record
Source: the AFDC public station register. Availability changes faster than the register does, so treat port counts as the configured capacity rather than a live status — this record was last confirmed on 2026-06-18.
Port counts describe how the site is configured, not whether a given port is free right now. Check the operator's own app before setting out if you are relying on a specific charger.