Skip to content
Pylon Plans

EV charging in Beaufort, South Carolina

The federal register lists 11 charging locations in and around Beaufort, offering 24 ports between them. None of them currently report DC fast charging, so plan for Level 2 speeds. That is the 14th highest count in South Carolina.

Charging locations
11
Total ports
24
DC fast share
0.0%
Ports per 10k residents
15.2
population 15,775 (2025)

Overview

Beaufort, SC has 11 charging locations on the federal register, offering 24 ports between them — the 14th largest count in South Carolina.

No DC fast charging is recorded here — every port on file is Level 1 or Level 2, which means hours rather than minutes for a meaningful charge.

Non-Networked operates the most locations here, 7 of them — 63.6% of the local total.

The population here is 15,775 (2025 estimate).

Charging networks

Not part of a network 7
64%
Tesla Destination 3
27%
ChargePoint 1
9%

Connector availability

how many sites list each connector
J1772 AC 5
42%
NEMA 14-50 AC 4
33%
Tesla / NACS AC or DC 3
25%

Charging locations

Site Network Ports DC fast Access
Tru by Hilton Beaufort - Tesla Destination Tesla Destination 6 Public
MCAS Beaufort / Phase A / Bldg 616 Not part of a network 3 Private
Rhett House Inn, a Select Registry Property - Tesla Destination Tesla Destination 2 Public
Parris Island / BEAM 2 Not part of a network 2 Private
MCRD Parris Island / BEAM 3 Not part of a network 2 Private
MCRD Parris Island / BEAM 1 Not part of a network 2 Private
MCAS Beaufort / BEAM 1 Not part of a network 2 Private
Bft Cty Admin Bulding ChargePoint 2 Public
Marine Corps Recruitment Depot - Parris Island Not part of a network 1 Private
Secession Golf Club - Tesla Destination Tesla Destination 1 Public
Grainger Nissan - Beaufort Not part of a network 1 Private

Also in this area

About this data

Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.