Skip to content
Pylon Plans

EV charging in Mount Pleasant, South Carolina

The federal register lists 10 charging locations in and around Mount Pleasant, offering 41 ports between them. None of them currently report DC fast charging, so plan for Level 2 speeds. That is the 18th highest count in South Carolina.

Charging locations
10
Total ports
41
DC fast share
0.0%
Ports per 10k residents
4.3
population 95,469 (2025)

Overview

The federal register lists 10 charging locations in and around Mount Pleasant, SC, with 41 ports in total.

Locations here average 4.1 ports each, so a site being occupied is less likely to leave you waiting than the raw location count suggests.

9 of the 10 locations are recorded as publicly accessible; the rest are restricted to residents, staff or fleet use.

Against a population of 95,469, that is 4.30 ports per 10,000 residents.

Charging networks

Tesla Destination 5
50%
ChargePoint 3
30%
Not part of a network 2
20%

Connector availability

how many sites list each connector
J1772 AC 9
64%
Tesla / NACS AC or DC 5
36%

Charging locations

Site Network Ports DC fast Access
Town Of Mount Pleasant-Municipal Complex - Tesla Destination Tesla Destination 11 Public
Long Point Center Wando Park - Tesla Destination Tesla Destination 6 Public
Mount Pleasant Memorial Waterfront Park - Tesla Destination Tesla Destination 6 Public
South Carolina Ports Authority Not part of a network 4 Private
Tru by Hilton-Mount Pleasant - Tesla Destination Tesla Destination 4 Public
Indigo Station Is Station 3 ChargePoint 2 Public
Towneplace Suites Charleston Mt. Pleasant - Tesla Destination Tesla Destination 2 Public
Indigo Station Is Station 1 ChargePoint 2 Public
South Carolina Ports Authority Not part of a network 2 Public
Indigo Station Is Station 2 ChargePoint 2 Public

Also in this area

About this data

Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.