Skip to content
Pylon Plans

EV charging in Belle Meade, Tennessee

The federal register lists 18 charging locations in and around Belle Meade, offering 65 ports between them. Of those, 3 sites have DC fast charging. That is the 12th highest count in Tennessee.

Charging locations
18
Total ports
65
DC fast share
58.5%
38 fast ports
Ports per 10k residents
248.0
population 2,621 (2025)

Overview

Of the 18 charging locations on file in Belle Meade, TN, 3 offer DC fast charging.

3 of the 18 locations have at least one DC fast port, or 16.7% of sites.

ChargePoint Network operates the most locations here, 7 of them — 38.9% of the local total.

The population here is 2,621 (2025 estimate).

Charging networks

ChargePoint 7
39%
Blink 6
33%
EVgo 1 6 fast
6%
Tesla 1 24 fast
6%
SWTCH 1
6%
Not part of a network 1
6%
Electrify America 1 8 fast
6%

Connector availability

how many sites list each connector
J1772 AC 15
83%
CCS (J1772 Combo) DC fast 2
11%
Tesla / NACS AC or DC 1
6%

Charging locations

Site Network Ports DC fast Access
Nashville, TN - Charlotte Pike - Tesla Supercharger Tesla 24 24 Public
Taubman The Mall at Green Hills (Nashville, TN) Electrify America 8 8 Public
The Mall at Green Hills EVgo 6 6 Public
Vertis Green Hills - Blink Blink 4 Public
Publix #1211 Not part of a network 2 Public
Metro Nashville Bellevue Ice 4 ChargePoint 2 Public
Metro Nashville Bellevue Ice 3 ChargePoint 2 Public
Metro Nashville Nfd Station 37 ChargePoint 2 Public
Metro Nashville Bellevue Ice 1 ChargePoint 2 Public
Metro Nashville Bellevue Ice 2 ChargePoint 2 Public
Sterling Nashville West Property Blink 2 Public
Bells Bluff Building 14 (Meter E) Blink 2 Public
Bells Bluff Building 1-2 (Meter D) Blink 2 Public
Metro Nashville Bellevue Lib ChargePoint 1 Public
Metro Nashville West Precinct ChargePoint 1 Public
Windsor Tower Condos Blink 1 Public
SWTCH Energy SWTCH 1 Public
HZ Rivertop Asset Management Blink 1 Public

Also in this area

About this data

Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.