Skip to content
Pylon Plans

EV charging in Dickson, Tennessee

The federal register lists 11 charging locations in and around Dickson, offering 39 ports between them. Of those, 6 sites have DC fast charging. That is the 20th highest count in Tennessee.

Charging locations
11
Total ports
39
DC fast share
53.8%
21 fast ports
Ports per 10k residents
22.9
population 17,051 (2025)

Overview

Of the 11 charging locations on file in Dickson, TN, 6 offer DC fast charging.

21 of those ports are DC fast — 53.8% of the total. That share is what decides whether a place works for a road trip or only for charging while parked overnight.

ChargePoint Network operates the most locations here, 2 of them — 18.2% of the local total.

Against a population of 17,051, that is 22.90 ports per 10,000 residents.

Charging networks

Not part of a network 2
18%
ChargePoint 2 2 fast
18%
EVgo 1 4 fast
9%
Tesla Destination 1
9%
Tesla 1 8 fast
9%
Noodoe 1
9%
Mercedes Benz 1 5 fast
9%
Envirospark 1
9%

Connector availability

how many sites list each connector
CCS (J1772 Combo) DC fast 5
36%
Tesla / NACS AC or DC 4
29%
J1772 AC 4
29%
CHAdeMO DC fast 1
7%

Charging locations

Site Network Ports DC fast Access
Comfort Inn Dickson - Tesla Destination Tesla Destination 10 Public
Dickson, TN - Tesla Supercharger Tesla 8 8 Public
Colton's Steak House Dickson MB.HPC Mercedes Benz 5 5 Public
Pilot Travel Center 409 EVgo 4 4 Public
Home2 Suites Hilton (Dickson_TN) Noodoe 4 Public
Nick Mayer Chevrolet Buick GMC of Dickson Blink 2 2 Public
Fairfield Inn & Suties by Marriott Dickson Envirospark 2 Public
Dickson Es Station 1 ChargePoint 1 1 Public
Dickson Es Station 2 ChargePoint 1 1 Public
Victory Nissan West Not part of a network 1 Private
Dickson Electric System Not part of a network 1 Public

Also in this area

About this data

Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.