EV charging in Burleson, Texas
The federal register lists 13 charging locations in and around Burleson, offering 36 ports between them. Of those, 4 sites have DC fast charging. That is the 44th highest count in Texas.
Overview
13 charging locations are on file in Burleson, TX, run between 6 networks.
The register counts 36 ports here, 15 of them DC fast.
6 different charging networks operate in Burleson, TX, which in practice means carrying more than one app or card.
Per head the figure is 6.30 ports per 10,000 people, though charging tends to follow traffic and retail rather than residents.
Charging networks
| ChargePoint | 7 | 1 fast | 54% |
| Not part of a network | 2 | 15% | |
| EVgo | 1 | 1 fast | 8% |
| Tesla | 1 | 12 fast | 8% |
| IN Charge | 1 | 1 fast | 8% |
| Ampup | 1 | 8% |
Connector availability
how many sites list each connector| J1772 AC | 10 | 63% |
| CCS (J1772 Combo) DC fast | 3 | 19% |
| CHAdeMO DC fast | 2 | 13% |
| Tesla / NACS AC or DC | 1 | 6% |
Charging locations
| Site | Network | Ports | DC fast | Access |
|---|---|---|---|---|
| Burleson, TX - Tesla Supercharger | Tesla | 12 | 12 | Public |
| Family Volkswagen of Burleson | Ampup | 6 | Private | |
| Cracker Barrel | EVgo | 2 | 1 | Public |
| Fvc200hmres Station 4 | ChargePoint | 2 | Public | |
| Fvc200hmres Station 1 | ChargePoint | 2 | Public | |
| Fvc200hmres Station 3 | ChargePoint | 2 | Public | |
| Ct4000 Bur Public Char | ChargePoint | 2 | Public | |
| Hmb Hospitality Fairfield Inn | ChargePoint | 2 | Public | |
| Nissan - Burleson | Not part of a network | 2 | Public | |
| Nissan - Burleson | IN Charge | 1 | 1 | Public |
| Stampede Hd Dcfast Hog | ChargePoint | 1 | 1 | Public |
| Nissan - Burleson | Not part of a network | 1 | Private | |
| Hiley Mazda Bur Mazda Shop | ChargePoint | 1 | Public |
Also in this area
About this data
Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.