EV charging in Farmers Branch, Texas
The federal register lists 14 charging locations in and around Farmers Branch, offering 30 ports between them. None of them currently report DC fast charging, so plan for Level 2 speeds. That is the 42nd highest count in Texas.
Overview
The federal register lists 14 charging locations in and around Farmers Branch, TX, with 30 ports in total.
No DC fast charging is recorded here — every port on file is Level 1 or Level 2, which means hours rather than minutes for a meaningful charge.
12 of the 14 locations are recorded as publicly accessible; the rest are restricted to residents, staff or fleet use.
Per head the figure is 7.80 ports per 10,000 people, though charging tends to follow traffic and retail rather than residents.
Charging networks
| ChargePoint | 11 | 79% | |
| Not part of a network | 1 | 7% | |
| Blink | 1 | 7% | |
| Ampup | 1 | 7% |
Connector availability
how many sites list each connector| J1772 AC | 14 | 100% |
Charging locations
| Site | Network | Ports | DC fast | Access |
|---|---|---|---|---|
| Clay Cooley Nissan | Not part of a network | 4 | Private | |
| DD Mercer Pkwy LLC 392 | Blink | 4 | Public | |
| Lakeview Lps 1 | ChargePoint | 2 | Public | |
| Parkside Vp-1 | ChargePoint | 2 | Public | |
| Hampton Fb Dual Hisfb | ChargePoint | 2 | Public | |
| Farmers Branch Manske Library | ChargePoint | 2 | Public | |
| Chateau Deville Cd - 1 | ChargePoint | 2 | Public | |
| Farmers Branch City Hall - 2 | ChargePoint | 2 | Public | |
| Farmers Branch Justice 1-dual | ChargePoint | 2 | Public | |
| Farmers Branch Ch 3-dual | ChargePoint | 2 | Public | |
| Farmers Branch Rec 2-dual | ChargePoint | 2 | Public | |
| Farmers Branch Rec 1-dual | ChargePoint | 2 | Public | |
| Farmers Branch City Hall - 1 | ChargePoint | 1 | Public | |
| McKinstry EV | Ampup | 1 | Private |
Also in this area
About this data
Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.