Skip to content
Pylon Plans

EV charging in Millcreek, Utah

The federal register lists 5 charging locations in and around Millcreek, offering 16 ports between them. Of those, 1 sites have DC fast charging. That is the 42nd highest count in Utah.

Charging locations
5
Total ports
16
DC fast share
25.0%
4 fast ports
Ports per 10k residents
2.5
population 63,926 (2025)

Overview

5 charging locations are on file in Millcreek, UT, run between 3 networks.

1 of the 5 locations has at least one DC fast port, or 20.0% of sites.

Only 3 networks operate here, so coverage depends heavily on membership.

Against a population of 63,926, that is 2.50 ports per 10,000 residents.

Charging networks

ChargePoint 2
40%
Ampup 2
40%
Electrify America 1 4 fast
20%

Connector availability

how many sites list each connector
J1772 AC 4
80%
CCS (J1772 Combo) DC fast 1
20%

Charging locations

Site Network Ports DC fast Access
RMP UTA Olympus Cove (Millcreek, UT) Electrify America 4 4 Public
St Marks ED Ampup 4 Public
St Marks East Parking Garage Ampup 4 Public
The Howick Left Parking ChargePoint 2 Public
The Howick Right Parking ChargePoint 2 Public

About this data

Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.