EV charging in Ludlow, Vermont
The federal register lists 5 charging locations in and around Ludlow, offering 20 ports between them. Of those, 1 sites have DC fast charging. That is the 23rd highest count in Vermont.
Charging locations
5
Total ports
20
DC fast share
20.0%
4 fast ports
Ports per 10k residents
260.8
population 767 (2025)
Overview
5 charging locations are on file in Ludlow, VT, run between 4 networks.
1 of the 5 locations has at least one DC fast port, or 20.0% of sites.
ChargePoint Network operates the most locations here, 2 of them — 40.0% of the local total.
Charging networks
| ChargePoint | 2 | 40% | |
| Tesla Destination | 1 | 20% | |
| Not part of a network | 1 | 20% | |
| Blink | 1 | 4 fast | 20% |
Connector availability
how many sites list each connector| J1772 AC | 4 | 57% |
| Tesla / NACS AC or DC | 1 | 14% |
| CCS (J1772 Combo) DC fast | 1 | 14% |
| CHAdeMO DC fast | 1 | 14% |
Charging locations
| Site | Network | Ports | DC fast | Access |
|---|---|---|---|---|
| Jackson Gore Hotel | Not part of a network | 9 | Public | |
| Main & Mountain | Blink | 6 | 4 | Public |
| Echo Lake Inn Echo Lake Inn 2 | ChargePoint | 2 | Public | |
| Echo Lake Inn Echo Lake Inn 1 | ChargePoint | 2 | Public | |
| Camp North - Tesla Destination | Tesla Destination | 1 | Public |
About this data
Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.