Reagan National Airport - B/C Terminal Parking
Arlington, Virginia
Overview
Reagan National Airport - B/C Terminal Parking is one of 417 charging locations recorded in Arlington, VA, with 73 ports.
Measured by ports rather than sites, this location represents 5.5% of all charging capacity recorded in Arlington, VA.
Connectors on site: J1772. The standard AC connector on North American EVs other than Tesla. Every non-Tesla EV sold in the US can use it directly, and Teslas can with the adapter that ships with the car.
Not part of a network operates 339 sites across Virginia, so the same app or card should work at the others.
Its closest neighbour is Dev Evsp Dca Ev2-8, 80 m to the NW.
Virginia has 1,997 charging locations in the federal register, and this is one of them.
Charging equipment
| Type | Ports | Typical power |
|---|---|---|
| Level 2 | 73 | Typically 6–19 kW |
Connectors
- J1772 AC
- The standard AC connector on North American EVs other than Tesla. Every non-Tesla EV sold in the US can use it directly, and Teslas can with the adapter that ships with the car.
Location
Loading the map fetches tiles from OpenFreeMap, a third party. Nothing is requested from them until you press the button.
© OpenStreetMap contributors · tiles by OpenFreeMap
Station record
as reported to the AFDC| Address | 2400 Ronald Reagan Washington National Airport Access Rd |
|---|---|
| City | Arlington, VA 22202 |
| Network | Not part of a network |
| Access | Public |
| Hours | 24 hours daily; pay lot |
| Pricing | Free |
| Opened | 3 Nov 2022 |
| Coordinates | 38.85235, -77.04417 |
| AFDC station ID | 235636 |
| Last confirmed by AFDC | 10 Dec 2024 |
Nearest charging locations
| Distance | Bearing | Site | DC fast |
|---|---|---|---|
| 80 m | NW | Dev Evsp Dca Ev2-8 | |
| 89 m | NW | Dev Evsp Dca Ev2-3 | |
| 91 m | NW | Power Sharing Dca Ev2-5 | |
| 94 m | NW | Dev Evsp Dca Ev2-1 | |
| 95 m | NW | Dev Evsp Dca Ev2-7 |
About this record
Station 235636 in the federal register. Pylon Plans calculates the rankings and comparisons on this page from the full national dataset; they are not part of the source record.
Port counts describe how the site is configured, not whether a given port is free right now. Check the operator's own app before setting out if you are relying on a specific charger.