EV charging in Edmonds, Washington
The federal register lists 17 charging locations in and around Edmonds, offering 25 ports between them. Of those, 4 sites have DC fast charging. That is the 37th highest count in Washington.
Overview
Edmonds, WA has 17 charging locations on the federal register, offering 25 ports between them — the 37th largest count in Washington.
DC fast ports make up 44.0% of capacity here — an unusually travel-oriented mix, typically the signature of interstate corridors rather than residential charging.
5 different charging networks operate in Edmonds, WA, which in practice means carrying more than one app or card.
Against a population of 42,748, that is 5.80 ports per 10,000 residents.
Charging networks
| Blink | 12 | 71% | |
| ChargePoint | 2 | 1 fast | 12% |
| EVgo | 1 | 4 fast | 6% |
| Vialynk | 1 | 4 fast | 6% |
| Nayax Energy | 1 | 2 fast | 6% |
Connector availability
how many sites list each connector| J1772 AC | 13 | 68% |
| CCS (J1772 Combo) DC fast | 4 | 21% |
| CHAdeMO DC fast | 2 | 11% |
Charging locations
| Site | Network | Ports | DC fast | Access |
|---|---|---|---|---|
| WinCo Foods - Edmonds #136 | EVgo | 4 | 4 | Public |
| Campbell Nissan/Edmonds | Vialynk | 4 | 4 | Public |
| Campbell Nissan - Edmonds | Nayax Energy | 2 | 2 | Public |
| Pcc Natural Pcc Edmonds | ChargePoint | 2 | Public | |
| Edmondsnissan Campbell North | ChargePoint | 1 | 1 | Public |
| Public Safety #3 | Blink | 1 | Public | |
| City Park #1 | Blink | 1 | Public | |
| Main Street #5 | Blink | 1 | Public | |
| Public Safety #4 | Blink | 1 | Public | |
| City Hall #2 | Blink | 1 | Public | |
| 6th Ave #6 | Blink | 1 | Public | |
| Mathay-Ballinger Park | Blink | 1 | Public | |
| Yost Pool | Blink | 1 | Public | |
| Meadowdale Community Clubhouse | Blink | 1 | Public | |
| Sierra Park | Blink | 1 | Public | |
| Seaview Park | Blink | 1 | Public | |
| Hickman Park | Blink | 1 | Public |
About this data
Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.