Signal Point
Liberty Lake, Washington
Overview
Open since 2026, Signal Point in Liberty Lake, WA provides 38 Level 2 ports.
This is a Level 2 site with no DC fast charging. Level 2 delivers a few hours for a substantial charge, so it suits places where the car is parked anyway — workplaces, hotels, long errands.
All charging here is AC: J1772. No DC fast charging is recorded at this location.
Access is listed as public.
The nearest other charging location is 963 m to the S, and there are 33 others within 10 km.
Liberty Lake, WA has 20 charging locations on the register between them offering 94 ports.
Charging equipment
| Type | Ports | Typical power |
|---|---|---|
| Level 2 | 38 | Typically 6–19 kW |
Connectors
- J1772 AC
- The standard AC connector on North American EVs other than Tesla. Every non-Tesla EV sold in the US can use it directly, and Teslas can with the adapter that ships with the car.
Location
Loading the map fetches tiles from OpenFreeMap, a third party. Nothing is requested from them until you press the button.
© OpenStreetMap contributors · tiles by OpenFreeMap
Station record
as reported to the AFDC| Address | 24085 E Mission Ave, Liberty Lake, WA 99019, E Mission Ave |
|---|---|
| City | Liberty Lake, WA 99019 |
| Network | Dirt Road |
| Access | Public |
| Opened | 9 Apr 2026 |
| Coordinates | 47.67357, -117.08220 |
| AFDC station ID | 457368 |
| Last confirmed by AFDC | 28 Aug 2026 |
Nearest charging locations
| Distance | Bearing | Site | DC fast |
|---|---|---|---|
| 963 m | S | Central Valley SD - Liberty Creek Elem | |
| 1.3 km (0.8 mi) | WSW | Big Trout Lodge Charger3 | |
| 1.3 km (0.8 mi) | WSW | Big Trout Lodge Charger4 | |
| 1.3 km (0.8 mi) | WSW | Big Trout Lodge Charger1 | |
| 1.3 km (0.8 mi) | WSW | Big Trout Lodge Charger2 |
About this record
Source: the AFDC public station register. Availability changes faster than the register does, so treat port counts as the configured capacity rather than a live status — this record was last confirmed on 2026-08-28.
Port counts describe how the site is configured, not whether a given port is free right now. Check the operator's own app before setting out if you are relying on a specific charger.