Skip to content
Pylon Plans

Tacoma Power Lot D EV Charging

Tacoma, Washington

Total ports
20
Level 2 ports
20
Rank in Tacoma
2nd
of 105 sites

Overview

Open since 2022, Tacoma Power Lot D EV Charging in Tacoma, WA provides 20 Level 2 ports.

Measured by ports rather than sites, this location represents 4.8% of all charging capacity recorded in Tacoma, WA.

Only the J1772 AC connector is listed. The standard AC connector on North American EVs other than Tesla. Every non-Tesla EV sold in the US can use it directly, and Teslas can with the adapter that ships with the car.

Access is listed as public, available contact station for hours of availability.

If you need DC fast charging rather than Level 2, the nearest site offering it is 938 m away to the S.

Washington has 3,372 charging locations in the federal register, and this is one of them.

Charging equipment

TypePortsTypical power
Level 2 20 Typically 6–19 kW

Connectors

J1772 AC
The standard AC connector on North American EVs other than Tesla. Every non-Tesla EV sold in the US can use it directly, and Teslas can with the adapter that ships with the car.

Location

Coordinates
47.22816, -122.48504

Loading the map fetches tiles from OpenFreeMap, a third party. Nothing is requested from them until you press the button.

Station record

as reported to the AFDC
Address 3628 S 35th St
City Tacoma, WA 98409
Network Ampup
Access Public
Hours Contact station for hours of availability
Pricing $0.21 per kWh
Opened 15 Sept 2022
Coordinates 47.22816, -122.48504
AFDC station ID 230420
Last confirmed by AFDC 10 Aug 2023

Nearest charging locations

DistanceBearingSiteDC fast
0 m N Tacoma Power Lot D EV Charging
55 m SSW Tacoma Public Utilities - Tesla Destination
161 m ESE TPU Water Fleet
820 m SSE 984 - Tacoma Wa Vmf
938 m S Tacoma Nissan 1

About this record

Details are drawn from the federal alternative-fuel station register (station ID 230420). The register records what operators report; it does not verify whether individual ports are working right now.

Port counts describe how the site is configured, not whether a given port is free right now. Check the operator's own app before setting out if you are relying on a specific charger.