Skip to content
Pylon Plans

Cell towers in Mentor, Minnesota

The FCC register lists 5 antenna structures in and around Mentor. That is the 155th highest count of any place in Minnesota.

Registered structures
5
Median height
98 m (320 ft)
+23.0% vs state median
Tallest
149 m (490 ft)
Per 100k residents
4672.9
population 107 (2025)

Overview

Mentor, MN has 5 registered antenna structures on the FCC register — the 155th largest count among the 698 places in Minnesota that have any.

Density works out to 2.62 registered structures per square mile of land area.

The median registered structure here stands 98 m (320 ft); the tallest reaches 149 m (490 ft).

The most recent registration on file here dates from 2013.

Structure types

Tower 3
60%
Guyed tower 2
40%

Largest registered owners

owner is not the same as carrier
Polk County Emergency Management Other 1
20%
Cctm2 LLC Other 1
20%
Minnesota, State Of Government 1
20%
Sba Structures, LLC Tower company 1
20%
Ccatt LLC Tower company 1
20%

Tallest registered structures

Height Type Built Owner ASR
149 m (490 ft) Guyed tower 2013 Ccatt LLC 2629336
107 m (350 ft) Tower 2013 Minnesota, State Of 2678852
98 m (320 ft) Tower 2001 Sba Structures, LLC 2628304
98 m (320 ft) Tower 2004 Polk County Emergency Management 2644119
78 m (255 ft) Guyed tower 1999 Cctm2 LLC 2608261

When they were registered

1990s 1
20%
2000s 2
40%
2010s 2
40%

Nearby places

About this data

Figures are drawn from the FCC's public antenna structure register (2026-08-23). It covers structures that need registering — broadly those over 200 feet or close to an airport — and not the many shorter installations that carry mobile traffic.

The FCC Antenna Structure Registration database covers structures that require registration — generally those over 200 feet or near airports. Many small cells, rooftop antennas and short towers are not registered and will not appear here.

"Owner" is the entity that registered the structure, usually a tower company such as American Tower or Crown Castle. It does not indicate which carriers operate equipment on the structure.