EV charging in Sierra Vista, Arizona
The federal register lists 15 charging locations in and around Sierra Vista, offering 56 ports between them. Of those, 5 sites have DC fast charging. That is the 18th highest count in Arizona.
Overview
Sierra Vista, AZ has 15 charging locations on the federal register, offering 56 ports between them — the 18th largest count in Arizona.
The register counts 56 ports here, 6 of them DC fast.
14 of the 15 locations are recorded as publicly accessible; the rest are restricted to residents, staff or fleet use.
The population here is 44,907 (2025 estimate).
Charging networks
| ChargePoint | 7 | 1 fast | 47% |
| EV Connect | 4 | 5 fast | 27% |
| Tesla Destination | 2 | 13% | |
| Not part of a network | 2 | 13% |
Connector availability
how many sites list each connector| J1772 AC | 11 | 46% |
| CCS (J1772 Combo) DC fast | 5 | 21% |
| CHAdeMO DC fast | 5 | 21% |
| Tesla / NACS AC or DC | 2 | 8% |
| NEMA 14-50 AC | 1 | 4% |
Charging locations
| Site | Network | Ports | DC fast | Access |
|---|---|---|---|---|
| Fort Huachuca | Not part of a network | 24 | Private | |
| Sierra Inn - Tesla Destination | Tesla Destination | 5 | Public | |
| Cyr Park | EV Connect | 3 | 1 | Public |
| Stone Field | EV Connect | 3 | 1 | Public |
| Public Library | EV Connect | 3 | 1 | Public |
| Sports Complex | EV Connect | 2 | 2 | Public |
| Hampton Inn by Hilton Sierra Vista - Tesla Destination | Tesla Destination | 2 | Public | |
| Best Western Sun Canyon | ChargePoint | 2 | Public | |
| Vista View Resort 1 | ChargePoint | 2 | Public | |
| Vista View Resort 2 | ChargePoint | 2 | Public | |
| Vista View Resort 3 | ChargePoint | 2 | Public | |
| Cochise County Sv L2 Left | ChargePoint | 2 | Public | |
| Cochise County Sv L2 Right | ChargePoint | 2 | Public | |
| Cochise County Sierra Vista L3 | ChargePoint | 1 | 1 | Public |
| Lawley Nissan | Not part of a network | 1 | Public |
Also in this area
About this data
Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.