Skip to content
Pylon Plans

EV charging in Chino, California

The federal register lists 16 charging locations in and around Chino, offering 85 ports between them. Of those, 3 sites have DC fast charging. That is the 216th highest count in California.

Charging locations
16
Total ports
85
DC fast share
61.2%
52 fast ports
Ports per 10k residents
8.8
population 96,957 (2025)

Overview

Of the 16 charging locations on file in Chino, CA, 3 offer DC fast charging.

52 of those ports are DC fast — 61.2% of the total. That share is what decides whether a place works for a road trip or only for charging while parked overnight.

ChargePoint Network operates the most locations here, 12 of them — 75.0% of the local total.

The population here is 96,957 (2025 estimate).

Charging networks

ChargePoint 12
75%
Tesla 2 46 fast
13%
Not part of a network 1
6%
Evcs 1 6 fast
6%

Connector availability

how many sites list each connector
J1772 AC 13
65%
Tesla / NACS AC or DC 4
20%
CCS (J1772 Combo) DC fast 2
10%
CHAdeMO DC fast 1
5%

Charging locations

Site Network Ports DC fast Access
Central & Walnut - Tesla Supercharger Tesla 26 26 Public
Chino, CA - Tesla Supercharger Tesla 20 20 Public
California State Prison Chino CIM Not part of a network 19 Private
Motel 6 Chino Evcs 6 6 Public
Ieua Rp-2 Station 02 ChargePoint 2 Public
Ieua Rp-2 Station 01 ChargePoint 2 Public
City of Chino Cocc #2 ChargePoint 1 Public
City of Chino City Hall #2 ChargePoint 1 Public
City of Chino Cocc #1 ChargePoint 1 Public
City of Chino City Hall #1 ChargePoint 1 Public
Ieua 1 Hqa Public 01 ChargePoint 1 Public
Ieua 1 Hqa Public 02 ChargePoint 1 Public
Ieua 1 Hqa Public 03 ChargePoint 1 Public
Ieua 1 Hqa Public 04 ChargePoint 1 Public
Ieua 1 Hqb Public 01 ChargePoint 1 Public
Ieua 1 Hqb Public 02 ChargePoint 1 Public

Also in this area

About this data

Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.