EV charging in Farmersville, California

The federal register lists 5 charging locations in and around Farmersville, offering 8 ports between them. None of them currently report DC fast charging, so plan for Level 2 speeds. That is the 394th highest count in California.

Charging locations
5
Total ports
8
DC fast share
0.0%
Ports per 10k residents
7.7
population 10,326 (2025)

Overview

Farmersville, CA has 5 charging locations on the federal register, offering 8 ports between them — the 394th largest count in California.

No DC fast charging is recorded here — every port on file is Level 1 or Level 2, which means hours rather than minutes for a meaningful charge.

Only 1 network operates here, so coverage depends heavily on membership.

Per head the figure is 7.70 ports per 10,000 people, though charging tends to follow traffic and retail rather than residents.

Charging networks

ChargePoint 5
100%

Connector availability

how many sites list each connector
J1772 AC 5
100%

Charging locations

Site Network Ports DC fast Access
Bots Fv1&2 Northside ChargePoint 2 Public
Bots 3&4westside Fv ChargePoint 2 Public
Bots Fv 5&6 Westside ChargePoint 2 Public
Bots Fv 8 West Side ChargePoint 1 Public
Bots Fv 7 West Side ChargePoint 1 Public

Also in this area

About this data

Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.