Skip to content
Pylon Plans

EV charging in Mount Shasta, California

The federal register lists 10 charging locations in and around Mount Shasta, offering 45 ports between them. Of those, 6 sites have DC fast charging. That is the 283rd highest count in California.

Charging locations
10
Total ports
45
DC fast share
82.2%
37 fast ports
Ports per 10k residents
146.5
population 3,071 (2025)

Overview

10 charging locations are on file in Mount Shasta, CA, run between 5 networks.

DC fast ports make up 82.2% of capacity here — an unusually travel-oriented mix, typically the signature of interstate corridors rather than residential charging.

5 different charging networks operate in Mount Shasta, CA, which in practice means carrying more than one app or card.

Per head the figure is 146.50 ports per 10,000 people, though charging tends to follow traffic and retail rather than residents.

Charging networks

ChargePoint 5 3 fast
50%
Tesla 2 20 fast
20%
Rivian Waypoints 1
10%
Rivian Adventure Network 1 6 fast
10%
Electric Era 1 8 fast
10%

Connector availability

how many sites list each connector
J1772 AC 4
36%
Tesla / NACS AC or DC 3
27%
CCS (J1772 Combo) DC fast 3
27%
CHAdeMO DC fast 1
9%

Charging locations

Site Network Ports DC fast Access
Mount Shasta, CA - 134 Morgan Way - Tesla Supercharger Tesla 16 16 Public
Electric Era Charging Station Electric Era 8 8 Public
Mount Shasta, CA Rivian Adventure Network 6 6 Public
Mount Shasta, CA - 111 Morgan Way - Tesla Supercharger Tesla 4 4 Public
Gf4eva Mt Shasta Pl1 ChargePoint 2 2 Public
Gf4eva Mt Shasta L2 ChargePoint 2 Public
Hospital Mmcms So Park 1 ChargePoint 2 Public
Hospital Mmcms So Park 2 ChargePoint 2 Public
Mount Shasta, CA - Best Western Plus Tree House Rivian Waypoints 2 Public
Gf4eva Mt Shasta DC ChargePoint 1 1 Public

Also in this area

About this data

Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.