Market Square L1 Stn 68-69
Oakland, California
Overview
Market Square L1 Stn 68-69 in Oakland, CA appears in the federal alternative-fuel station register with 2 charging ports in total.
This is a Level 2 site with no DC fast charging. Level 2 delivers a few hours for a substantial charge, so it suits places where the car is parked anyway — workplaces, hotels, long errands.
Only the J1772 AC connector is listed. The standard AC connector on North American EVs other than Tesla. Every non-Tesla EV sold in the US can use it directly, and Teslas can with the adapter that ships with the car.
ChargePoint operates 14,209 sites across California, so the same app or card should work at the others.
The nearest other charging location is 10 m to the ESE, and there are 493 others within 10 km.
Of the 276 charging locations in Oakland, CA, 14 offer DC fast charging.
Charging equipment
| Type | Ports | Typical power |
|---|---|---|
| Level 2 | 2 | Typically 6–19 kW |
Connectors
- J1772 AC
- The standard AC connector on North American EVs other than Tesla. Every non-Tesla EV sold in the US can use it directly, and Teslas can with the adapter that ships with the car.
Location
Loading the map fetches tiles from OpenFreeMap, a third party. Nothing is requested from them until you press the button.
© OpenStreetMap contributors · tiles by OpenFreeMap
Station record
as reported to the AFDC| Address | 585 9th St |
|---|---|
| City | Oakland, CA 94607 |
| Network | ChargePoint |
| Access | Public |
| Hours | 24 hours daily |
| Opened | 10 Jul 2026 |
| Coordinates | 37.80195, -122.27640 |
| AFDC station ID | 463382 |
| Last confirmed by AFDC | 28 Aug 2026 |
Nearest charging locations
| Distance | Bearing | Site | DC fast |
|---|---|---|---|
| 10 m | ESE | Market Square L2 Stn 62 | |
| 11 m | S | Market Square L1 Stn 99-100 | |
| 12 m | NW | Market Square L1 Stn 48-49 | |
| 12 m | E | Market Square L1 Stn 42-43 | |
| 14 m | NW | Market Square L2 Stn 63 |
About this record
Source: the AFDC public station register. Availability changes faster than the register does, so treat port counts as the configured capacity rather than a live status — this record was last confirmed on 2026-08-28.
Port counts describe how the site is configured, not whether a given port is free right now. Check the operator's own app before setting out if you are relying on a specific charger.