EV charging in Stevenson Ranch, California
The federal register lists 14 charging locations in and around Stevenson Ranch, offering 48 ports between them. Of those, 6 sites have DC fast charging. That is the 231st highest count in California.
Overview
The federal register lists 14 charging locations in and around Stevenson Ranch, CA, with 48 ports in total.
6 of the 14 locations have at least one DC fast port, or 42.9% of sites.
7 different charging networks operate in Stevenson Ranch, CA, which in practice means carrying more than one app or card.
Charging networks
| ChargePoint | 6 | 1 fast | 43% |
| EVgo | 2 | 10 fast | 14% |
| Electrify America | 2 | 10 fast | 14% |
| Tesla | 1 | 8 fast | 7% |
| Not part of a network | 1 | 7% | |
| Noodoe | 1 | 7% | |
| EV Connect | 1 | 7% |
Connector availability
how many sites list each connector| J1772 AC | 8 | 47% |
| CCS (J1772 Combo) DC fast | 5 | 29% |
| CHAdeMO DC fast | 3 | 18% |
| Tesla / NACS AC or DC | 1 | 6% |
Charging locations
| Site | Network | Ports | DC fast | Access |
|---|---|---|---|---|
| Chick-fil-A Store #5189 - Valencia | EV Connect | 9 | Public | |
| Valencia, CA - Tesla Supercharger | Tesla | 8 | 8 | Public |
| Westfield Valencia Town Center (Valencia, CA) | Electrify America | 6 | 6 | Public |
| Valencia Crossroads | EVgo | 6 | 6 | Public |
| Inventrust Stevenson Ranch Plaza (Stevenson Ranch, | Electrify America | 4 | 4 | Public |
| In-N-Out Valencia | EVgo | 4 | 4 | Public |
| Audi Valencia | Not part of a network | 2 | Private | |
| Gf4eva Hilton L2 | ChargePoint | 2 | Public | |
| Confluence Park Middleton1 | ChargePoint | 2 | Public | |
| Gf4eva Hilton DC | ChargePoint | 1 | 1 | Public |
| Confluence Park Ramblewood2 | ChargePoint | 1 | Public | |
| Little Tokyo lofts | Noodoe | 1 | Public | |
| Confluence Park Ramblewood1 | ChargePoint | 1 | Public | |
| Confluence Park Verve Park | ChargePoint | 1 | Public |
Also in this area
About this data
Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.