Skip to content
Pylon Plans

Saint Pope Kerollos VI Coptic Church

Westminster, California

Total ports
6
Level 2 ports
6
Rank in Westminster
3rd
of 20 sites

Overview

Saint Pope Kerollos VI Coptic Church is charging at a place of worship in Westminster, CA, providing 6 Level 2 ports.

This is a Level 2 site with no DC fast charging. Level 2 delivers a few hours for a substantial charge, so it suits places where the car is parked anyway — workplaces, hotels, long errands.

Only the J1772 AC connector is listed. The standard AC connector on North American EVs other than Tesla. Every non-Tesla EV sold in the US can use it directly, and Teslas can with the adapter that ships with the car.

It is a public site at a place of worship, so opening hours in practice may follow the host business rather than the charging network.

The nearest other charging location is 806 m to the SW, and there are 447 others within 10 km.

Of the 20 charging locations in Westminster, CA, 4 offer DC fast charging.

Charging equipment

TypePortsTypical power
Level 2 6 Typically 6–19 kW

Connectors

J1772 AC
The standard AC connector on North American EVs other than Tesla. Every non-Tesla EV sold in the US can use it directly, and Teslas can with the adapter that ships with the car.

Location

Coordinates
33.76079, -117.97860

Loading the map fetches tiles from OpenFreeMap, a third party. Nothing is requested from them until you press the button.

Station record

as reported to the AFDC
Address 8642 Wminster Blvd
City Westminster, CA 92683
Network Ampup
Access Public
Hours Contact station for hours of availability
Opened 15 Sept 2022
Coordinates 33.76079, -117.97860
AFDC station ID 230434
Last confirmed by AFDC 10 Nov 2022

Nearest charging locations

DistanceBearingSiteDC fast
806 m SW Civic Center Civiccenter1
809 m SW Civic Center Civiccenter3
810 m SW Civic Center Civiccenter2
812 m SW Civic Center Civiccenter4
825 m SW Civic Center Civiccenter5

About this record

Source: the AFDC public station register. Availability changes faster than the register does, so treat port counts as the configured capacity rather than a live status — this record was last confirmed on 2022-11-10.

Port counts describe how the site is configured, not whether a given port is free right now. Check the operator's own app before setting out if you are relying on a specific charger.