MCP Key West LLC
Rockville, Maryland
Overview
Open since 2022, MCP Key West LLC in Rockville, MD provides 12 Level 2 ports.
This is a Level 2 site with no DC fast charging. Level 2 delivers a few hours for a substantial charge, so it suits places where the car is parked anyway — workplaces, hotels, long errands.
Only the J1772 AC connector is listed. The standard AC connector on North American EVs other than Tesla. Every non-Tesla EV sold in the US can use it directly, and Teslas can with the adapter that ships with the car.
Access is listed as public, available 24 hours daily.
This is a well-served area: 152 other charging locations sit within 10 km.
Of the 91 charging locations in Rockville, MD, 8 offer DC fast charging.
Charging equipment
| Type | Ports | Typical power |
|---|---|---|
| Level 2 | 12 | Typically 6–19 kW |
Connectors
- J1772 AC
- The standard AC connector on North American EVs other than Tesla. Every non-Tesla EV sold in the US can use it directly, and Teslas can with the adapter that ships with the car.
Location
Loading the map fetches tiles from OpenFreeMap, a third party. Nothing is requested from them until you press the button.
© OpenStreetMap contributors · tiles by OpenFreeMap
Station record
as reported to the AFDC| Address | 9711 Key West Avenue |
|---|---|
| City | Rockville, MD 20850 |
| Network | Blink |
| Access | Public |
| Hours | 24 hours daily |
| Opened | 10 Aug 2022 |
| Coordinates | 39.10542, -77.20590 |
| AFDC station ID | 255175 |
| Last confirmed by AFDC | 28 Aug 2026 |
Nearest charging locations
| Distance | Bearing | Site | DC fast |
|---|---|---|---|
| 217 m | E | Shadygrove Shady Grove St1 | |
| 638 m | SE | BioReliance | |
| 840 m | ESE | National Cancer Institute Parking Garage | |
| 996 m | SSE | Greenervolts 9900 Mcd Cpt | |
| 1.1 km (0.7 mi) | S | Are Md 24 Station 4 |
About this record
Station 255175 in the federal register. Pylon Plans calculates the rankings and comparisons on this page from the full national dataset; they are not part of the source record.
Port counts describe how the site is configured, not whether a given port is free right now. Check the operator's own app before setting out if you are relying on a specific charger.