The federal register lists 16 charging locations in and around Canton, offering 40 ports between them. None of them currently report DC fast charging, so plan for Level 2 speeds. That is the 65th highest count in New York.

Charging locations
16
Total ports
40
DC fast share
0.0%
Ports per 10k residents
58.0
population 6,894 (2025)

Overview

16 charging locations are on file in Canton, NY, run between 4 networks.

Only 0.0% of ports here are DC fast. Most of the capacity is Level 2, which suits workplaces, hotels and apartment parking rather than a quick stop mid-journey.

ChargePoint Network operates the most locations here, 12 of them — 75.0% of the local total.

Per head the figure is 58 ports per 10,000 people, though charging tends to follow traffic and retail rather than residents.

Charging networks

ChargePoint 12
75%
Not part of a network 2
13%
Tesla Destination 1
6%
Chargesmart EV 1
6%

Connector availability

how many sites list each connector
J1772 AC 15
94%
Tesla / NACS AC or DC 1
6%

Charging locations

Site Network Ports DC fast Access
Fairfield Inn & Suites Canton Chargesmart EV 10 Public
Best Western University Inn - Tesla Destination Tesla Destination 3 Public
Cantoncharge Hodskin St 1.1 ChargePoint 2 Public
EJ Noble Building Medical Laboratory Not part of a network 2 Public
Slu - Vilas EV Vilas Hall Ev1 ChargePoint 2 Public
Slu - Vilas EV Vilas Hall Ev2 ChargePoint 2 Public
Slu - Vilas EV Slu-bookstore ChargePoint 2 Public
Slu - Vilas EV Slu-tenniscourt ChargePoint 2 Public
Canton Csd Unit 1 ChargePoint 2 Public
Canton Csd Unit 2 ChargePoint 2 Public
Suny Canton Wh Lot 5 ChargePoint 2 Public
Suny Canton Service Lot 12 ChargePoint 2 Public
Suny Canton Mcc Lot 13 ChargePoint 2 Public
Suny Canton Fh Lot 8 ChargePoint 2 Public
Suny Canton Nh East Lot 10b ChargePoint 2 Public
Fairfield Inn & Suites by Marriott Canton Not part of a network 1 Public