Clifton Park Center
Clifton Gardens, New York
Overview
Clifton Park Center is a Quickcharge site in Clifton Gardens, NY, with 10 Level 2 ports.
This is a Level 2 site with no DC fast charging. Level 2 delivers a few hours for a substantial charge, so it suits places where the car is parked anyway — workplaces, hotels, long errands.
Connectors on site: J1772. The standard AC connector on North American EVs other than Tesla. Every non-Tesla EV sold in the US can use it directly, and Teslas can with the adapter that ships with the car.
It is a public site at a shopping centre, so opening hours in practice may follow the host business rather than the charging network.
If you need DC fast charging rather than Level 2, the nearest site offering it is 266 m away to the N.
Clifton Gardens, NY has 42 charging locations on the register between them offering 178 ports.
Charging equipment
| Type | Ports | Typical power |
|---|---|---|
| Level 2 | 10 | Typically 6–19 kW |
Connectors
- J1772 AC
- The standard AC connector on North American EVs other than Tesla. Every non-Tesla EV sold in the US can use it directly, and Teslas can with the adapter that ships with the car.
Location
Loading the map fetches tiles from OpenFreeMap, a third party. Nothing is requested from them until you press the button.
© OpenStreetMap contributors · tiles by OpenFreeMap
Station record
as reported to the AFDC| Address | 22 Clifton Country Rd |
|---|---|
| City | Clifton Gardens, NY 12065 |
| Network | Quickcharge |
| Access | Public |
| Hours | 24 hours daily |
| Opened | 26 Mar 2025 |
| Coordinates | 42.85808, -73.77897 |
| AFDC station ID | 462005 |
| Last confirmed by AFDC | 15 Jul 2026 |
Nearest charging locations
| Distance | Bearing | Site | DC fast |
|---|---|---|---|
| 102 m | WNW | Hilton Garden Inn Clifton Park | |
| 266 m | N | Clifton Park, NY - Tesla Supercharger | 24 |
| 271 m | SW | Homewood Inn & Suites Clifton Park | |
| 380 m | WSW | Atrium Evcharge Parkplaza Ev2 | |
| 577 m | WSW | Atrium Evcharge Ev8 |
About this record
Source: the AFDC public station register. Availability changes faster than the register does, so treat port counts as the configured capacity rather than a live status — this record was last confirmed on 2026-07-15.
Port counts describe how the site is configured, not whether a given port is free right now. Check the operator's own app before setting out if you are relying on a specific charger.