Skip to content
Pylon Plans

EV charging in Chambersburg, Pennsylvania

The federal register lists 9 charging locations in and around Chambersburg, offering 41 ports between them. Of those, 4 sites have DC fast charging. That is the 45th highest count in Pennsylvania.

Charging locations
9
Total ports
41
DC fast share
63.4%
26 fast ports
Ports per 10k residents
17.5
population 23,376 (2025)

Overview

Of the 9 charging locations on file in Chambersburg, PA, 4 offer DC fast charging.

Locations here average 4.6 ports each, so a site being occupied is less likely to leave you waiting than the raw location count suggests.

5 of the 9 locations are recorded as publicly accessible; the rest are restricted to residents, staff or fleet use.

Per head the figure is 17.50 ports per 10,000 people, though charging tends to follow traffic and retail rather than residents.

Charging networks

Not part of a network 4
44%
Tesla Destination 1
11%
Tesla 1 12 fast
11%
Francis Energy 1 4 fast
11%
Electrify America 1 6 fast
11%
Blink 1 4 fast
11%

Connector availability

how many sites list each connector
J1772 AC 4
36%
CCS (J1772 Combo) DC fast 3
27%
Tesla / NACS AC or DC 2
18%
NEMA 5-15 AC 2
18%

Charging locations

Site Network Ports DC fast Access
Chambersburg, PA - Tesla Supercharger Tesla 12 12 Public
Milbrook Franklin Center (Chambersburg, PA) Electrify America 6 6 Public
Letterkenny Army Depot - Station 2 Not part of a network 6 Private
Chambersburg Hyundai Blink 4 4 Public
Chambersburg Square Francis Energy 4 4 Public
Letterkenny Army Depot - Station 1 Not part of a network 4 Private
Wilson College - Brooks Science Center Not part of a network 2 Public
Hertz Local Edition #6810 - Tesla Destination Tesla Destination 2 Private
Fitzgerald Nissan Not part of a network 1 Private

Also in this area

About this data

Data comes from the Alternative Fuels Data Center's public station register. It covers publicly reported charging infrastructure; home chargers and unreported private installations do not appear. Port counts describe configured capacity, not live availability.